Q:
Waterfall model is not suitable for:
belongs to collection: SOFTWARE LIFE CYCLE MODELS MCQ
All Answers
mhmadesk
2022-06-07
mhmadesk
2022-06-07
need an explanation for this answer? contact us directly to get an explanation for this answer
(c).Accommodating changes
need an explanation for this answer? contact us directly to get an explanation for this answertotal answers (2)
SOFTWARE LIFE CYCLE MODELS MCQ
- RAD Software process model stands for _____
- What is the simplest model of software development paradigm?
- The architectural model is derived from which of these sources?
- Which model is also known as Verification and validation model?
- Which model is not suitable for large software projects but good one for learning and experimenting?
- Which model is also called as the classic life cycle or the Waterfall model?
- What is the average effective global activity rate in an evolving E-type system is invariant over the lifetime of the product?
- Build & Fix Model is suitable for programming exercises of ___________ LOC (Line of Code)
- Which one of the following models is not suitable for accommodating any change?
- Which is not one of the types of prototype of Prototyping Model?
- Which one of the following is not a phase of Prototyping Model?
- Which of the following statements regarding Build & Fix Model is wrong?
- RAD Model has
- What is the major drawback of using RAD Model?
- SDLC stands for
- Which model can be selected if user is involved in all the phases of SDLC?
- Which one of the following is not an Evolutionary Process Model?
- The Incremental Model is a result of combination of elements of which two models?
- What is the major advantage of using Incremental Model?
- The spiral model was originally proposed by
- The spiral model has two dimensions namely _____________ and ____________
- How is WINWIN Spiral Model different from Spiral Model?
- Identify the disadvantage of Spiral Model
- How is Incremental Model different from Spiral Model?
- If you were to create client/server applications, which model would you go for?
- Selection of a model is based on
- Which two models doesn’t allow defining requirements early in the cycle?
- Which of the following life cycle model can be chosen if the development team has less experience on similar projects?
- If you were a lead developer of a software company and you are asked to submit a project/product within a stipulated time-frame with no cost barriers, which model would you select?
- Which two of the following models will not be able to give the desired outcome if user’s participation is not involved?
- A company is developing an advance version of their current software available in the market, what model approach would they prefer ?
- Choose the correct option from given below:
- Which of the following model has a major disadvantage in terms of the coding phase of a software life cycle model ?
- The tools that support different stages of software development life cycle are called as ______
- Find out which phase is not available in SDLC?
- Which SDLC activity does the user initiates the request for a desired software product?
- First level of prototype is evaluated by ______
- Which of the items listed below is not one of the software engineering layers?
- For the best Software model suitable for the project, in which of the phase the developers decide a roadmap for project plan?
- Where is the prototyping model of software development well suited?
- Design phase is followed by ______
- The two dimensions of spiral model are
- The Incremental Model is combination of elements of
- Model preferred to create client/server applications is
- Identify the correct statement with respect to Evolutionary development:
- Spiral model was developed by
- Software evolution does not comprises:
- The linear sequential model of software development is
- The linear sequential model of software development is also known as the
- The incremental model of software development is
- The rapid application development model is
- Evolutionary software process models
- The prototyping model of software development is
- The spiral model of software development
- The concurrent development model is
- The component-based development model is
- The formal methods model of software development makes use of mathematical methods to
- Which of these is not one of the phase names defined by the Unified Process model for software development?
- Which of the following is not necessary to apply agility to a software process?
- How do you create agile processes to manage unpredictability?
- Which of the following traits need to exist among the members of an agile software team?
- What are the four framework activities found in the Extreme Programming (XP) process model?
- What are the three framework activities for the Adaptive Software Development (ASD) process model?
- Which is not one of the key questions that is answered by each team member at each daily Scrum meeting?
- Agile Modeling (AM) provides guidance to practitioner during which of these software tasks?
- The largest percentage of total life cycle cost of software is:
- The most creative and challenging phase of system life cycle is
- The advantages of creating a prototype are
- The main activity of the design phase of the system life cycle is to
- The main purpose of the system investigation phase is to produce
- A system analyst does not need to consider
- A feasibility study
- The combination of the top-down and the bottom-up approach may be referred to as an
- System prototyping helps the designer in
- Mistakes made in the system analysis stage show up in
- Which of the following is not true of the conversion phase of the development life cycle?
- Which of the following is not a factor in the failure of the systems development projects ?
- In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?
- The feasibilities studied in preliminary investigation is (are)
- To which phase of SDLC, is file conversion related?
- Which of the following activities does not belong to the Implementation phase of the SDLC?
- A pseudocode is a/an
- An audit trial is
- In Concurrent Development Model, when end user indicates changes in requirements must be made, modeling activity moves from under development state into the
- In Concurrent Development Model, event generated in process network trigger transitions among the
- In Concurrent Development Model, for example when analysis model correction is generated, analysis action present in awaiting state moves into
- In Concurrent Development Model, for example when analysis model correction is not generated, analysis action is present in
- In Concurrent Development Model, when initial communication is not completed modeling activity existed in the
- Model which can be represent schematically as series of framework activities, software engineering actions and tasks and their associated states is
- Concurrent model development is also known as
- In Concurrent Development Model, externally observable mode of behavior is termed as
- In Concurrent Development Model, early in project when communication activity has completed its first iteration it exists in the
- In Concurrent Development Model, all activities exist concurrently but reside in
- In Concurrent Development Model, when initial communication is completed modeling makes a transition into
- In incremental process model, coding of software is done in
- When incremental model is used, first increment is often a
- Once core product is analyzed by client, there exist a
- Incremental process model focuses on delivery of an operational product with
- In incremental process model, each linear sequence of a software produces deliverable
- Errors are easy to be identified in
- Each iteration in incremental model passes through the
- A process of software development where requirements are broken down into multiple standalone modules of software development cycle
- Incremental process model phase which acknowledged that software is delivered to customer who evaluates delivered product and provides feedback based on evaluation and then iteration is processed is
- In incremental process model, each iteration phase is rigid and
- In incremental process model, requirement and specification of software are collected in
- Model which combines elements of waterfall model applied in an iterative fashion is
- In incremental process model, some high-end function are designed in
- Incremental process model phase in which modification of a software product is done after delivery to correct faults, to improve performance or other attributes is
- Each process model also prescribes a
- Prescriptive model often encompass capabilities of
- Prescriptive process model is also referred to as
- Manner in which process elements are interrelated to one another is
- We call perspective process model \'perspective\' because they prescribe a set of process
- In prototype model, iteration is planned quickly in
- Model which is useful when developer is not sure of requirements, or efficiency of an algorithm , business rules, response time, etc is
- In prototype model, iteration is planned quickly in quick plan phase and modeling of that plan occurs in
- Phase of prototype model which focuses on a representation of those aspects of software that will visible to end user is
- Prototyping model is based on
- Model which include set of general objectives for software is
- Prototype is evaluated by customer or end user in
- Developer often make implementation compromises in order to get a prototype working
- To refine requirements for software, prototype model use
- In prototype model , phase which contains objectives of prototype project and its requirements is
- Prototyping paradigm begins with
- In prototype model, quick design phase leads to construction of
- RAD stands for
- Incremental software process model that emphasizes a short development cycle is
- High speed adaptation of waterfall model in which rapid development is achieved by using a component based construction approach is
- RAD is a type of
- RAD SDLC model should be chosen only if resources with high business knowledge are available and there is a need to produce system in a
- Modeling encompasses phases which are
- Phase in which task scheduling is accomplished and is essential because multiple software teams work in parallel on different system functions is
- Model suitable for project requiring shorter development times is
- In RAD modeling, product model which is under development is designed in terms of flow of information and distribution of information between various business channels in
- If developers and customers are not committed to rapid fire activities necessary to complete system in much abbrevative time frame, RAD projects will
- Phase which establishes a basis of subsequent iterations, if required is
- Phase which emphasizes use of per-existing software components and application of automatic code generation is
- In RAD model, information gathered in business modeling phase is reviewed and analyzed to form sets of data objects vital for business in
- Phase that works to understand business problem and information characteristics that software must accommodate is
- RAD process enables a development team to create in a short time a
- In RAD modeling, data objects defined in
- Phase that establish design representations that serve as basis for RAD\'s construction activity is
- In RAD modeling, new components and all its interfaces testing are done by
- RAD should be used only when a system can be modularized to be delivered in an
- In RAD modeling, data object sets defined in data modeling phase are converted to establish business information flow needed to achieve specific business objectives as per business model in
- Business model is a candidate for RAD, if a business application can be modularized in a way that enables each major function to be completed in
- Automated tools that are used to convert process models into code and actual system are termed as
- RAD may not be appropriate when
- A relatively new software engineering paradigm that provides a process and methodological approach for defining, specifying, designing and constructing aspects is referred to as
- Model which contains a set of activities that leads to formal mathematical specifications of software is
- When concern cut across multiple system functions, features and information, they are termed as
- AOSD stands for
- COTS leads to reduction in development cycle up to
- AOCE uses a concept of horizontal slices through vertically decomposed software components called
- COTS has a productivity index of
- Component-based development model contains many characteristics of
- Development of formal models is currently quite
- Concerns related to task synchronization or memory management is
- AOP stands for
- Component-based development model leads to Software
- Components which provides targeted functionality with well-defined interfaces that enable component to be integrated into software are termed as
- Each loop in spiral model represents a
- System feasibility in spiral model is determined in
- First circuit around spiral model represents a
- Spiral model originally proposed by
- Evolutionary software process model that couples iterative nature of prototyping with controlled and systematic aspect of waterfall model is
- Model in which overall success of a project highly depends on risks analysis phase is called
- Each loop in spiral model is splited into
- Spiral model is
- Collection of use cases describe how outside actors interact with system and gain value from it is defined by
- Model which identifies design classes, subsystems and interfaces between them is
- Model describes test that are used to ensure that use case are properly reflected in software that has been constructed is
- Model that translates design classes into software components is
- Model which maps components into physical computing environment is
- Bradac found that linear nature of waterfall model leads to
- Waterfall model phase which acknowledged that software is delivered to customer who evaluates delivered product and provides feedback based on evaluation is
- Waterfall model is
- In waterfall model, phases
- Waterfall model phase which combines code generation and testing that is required to uncover errors in code is
- Waterfall model phase in which all possible requirements of system to be developed are captured and project initiate is
- Waterfall model is also known as
- Waterfall model phase which establishes a plan for software engineering work that follows i.e estimating, scheduling, tracking is
- Waterfall model phase in which modification of a software product is done after delivery to correct faults, to improve performance or other attributes is
- Oldest paradigm for software engineering is
- Model in which any phase in development process begins only if previous phase is complete is
- Waterfall model were originally proposed by
- Waterfall model phase in which system design is prepared and this system design helps in specifying system requirements and define overall system architecture is
- Which of the following are valid step in SDLC framework?
- Which of the following is the first step in SDLC framwork?
- Which of the following is not correct model in Software Development Paradigm?
- Waterfall model is not suitable for:
- In the maintenance phase the product must be tested against previous test cases. This is known as __________ testing
- Which type of integration testing uses stubs?
- Which one of the following is a functional requirement?
(c).Accommodating changes
need an explanation for this answer? contact us directly to get an explanation for this answer