Q:
In Concurrent Development Model, all activities exist concurrently but reside in
belongs to collection: SOFTWARE LIFE CYCLE MODELS MCQ
SOFTWARE LIFE CYCLE MODELS MCQ
- RAD Software process model stands for _____
- What is the simplest model of software development paradigm?
- The architectural model is derived from which of these sources?
- Which model is also known as Verification and validation model?
- Which model is not suitable for large software projects but good one for learning and experimenting?
- Which model is also called as the classic life cycle or the Waterfall model?
- What is the average effective global activity rate in an evolving E-type system is invariant over the lifetime of the product?
- Build & Fix Model is suitable for programming exercises of ___________ LOC (Line of Code)
- Which one of the following models is not suitable for accommodating any change?
- Which is not one of the types of prototype of Prototyping Model?
- Which one of the following is not a phase of Prototyping Model?
- Which of the following statements regarding Build & Fix Model is wrong?
- RAD Model has
- What is the major drawback of using RAD Model?
- SDLC stands for
- Which model can be selected if user is involved in all the phases of SDLC?
- Which one of the following is not an Evolutionary Process Model?
- The Incremental Model is a result of combination of elements of which two models?
- What is the major advantage of using Incremental Model?
- The spiral model was originally proposed by
- The spiral model has two dimensions namely _____________ and ____________
- How is WINWIN Spiral Model different from Spiral Model?
- Identify the disadvantage of Spiral Model
- How is Incremental Model different from Spiral Model?
- If you were to create client/server applications, which model would you go for?
- Selection of a model is based on
- Which two models doesn’t allow defining requirements early in the cycle?
- Which of the following life cycle model can be chosen if the development team has less experience on similar projects?
- If you were a lead developer of a software company and you are asked to submit a project/product within a stipulated time-frame with no cost barriers, which model would you select?
- Which two of the following models will not be able to give the desired outcome if user’s participation is not involved?
- A company is developing an advance version of their current software available in the market, what model approach would they prefer ?
- Choose the correct option from given below:
- Which of the following model has a major disadvantage in terms of the coding phase of a software life cycle model ?
- The tools that support different stages of software development life cycle are called as ______
- Find out which phase is not available in SDLC?
- Which SDLC activity does the user initiates the request for a desired software product?
- First level of prototype is evaluated by ______
- Which of the items listed below is not one of the software engineering layers?
- For the best Software model suitable for the project, in which of the phase the developers decide a roadmap for project plan?
- Where is the prototyping model of software development well suited?
- Design phase is followed by ______
- The two dimensions of spiral model are
- The Incremental Model is combination of elements of
- Model preferred to create client/server applications is
- Identify the correct statement with respect to Evolutionary development:
- Spiral model was developed by
- Software evolution does not comprises:
- The linear sequential model of software development is
- The linear sequential model of software development is also known as the
- The incremental model of software development is
- The rapid application development model is
- Evolutionary software process models
- The prototyping model of software development is
- The spiral model of software development
- The concurrent development model is
- The component-based development model is
- The formal methods model of software development makes use of mathematical methods to
- Which of these is not one of the phase names defined by the Unified Process model for software development?
- Which of the following is not necessary to apply agility to a software process?
- How do you create agile processes to manage unpredictability?
- Which of the following traits need to exist among the members of an agile software team?
- What are the four framework activities found in the Extreme Programming (XP) process model?
- What are the three framework activities for the Adaptive Software Development (ASD) process model?
- Which is not one of the key questions that is answered by each team member at each daily Scrum meeting?
- Agile Modeling (AM) provides guidance to practitioner during which of these software tasks?
- The largest percentage of total life cycle cost of software is:
- The most creative and challenging phase of system life cycle is
- The advantages of creating a prototype are
- The main activity of the design phase of the system life cycle is to
- The main purpose of the system investigation phase is to produce
- A system analyst does not need to consider
- A feasibility study
- The combination of the top-down and the bottom-up approach may be referred to as an
- System prototyping helps the designer in
- Mistakes made in the system analysis stage show up in
- Which of the following is not true of the conversion phase of the development life cycle?
- Which of the following is not a factor in the failure of the systems development projects ?
- In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?
- The feasibilities studied in preliminary investigation is (are)
- To which phase of SDLC, is file conversion related?
- Which of the following activities does not belong to the Implementation phase of the SDLC?
- A pseudocode is a/an
- An audit trial is
- In Concurrent Development Model, when end user indicates changes in requirements must be made, modeling activity moves from under development state into the
- In Concurrent Development Model, event generated in process network trigger transitions among the
- In Concurrent Development Model, for example when analysis model correction is generated, analysis action present in awaiting state moves into
- In Concurrent Development Model, for example when analysis model correction is not generated, analysis action is present in
- In Concurrent Development Model, when initial communication is not completed modeling activity existed in the
- Model which can be represent schematically as series of framework activities, software engineering actions and tasks and their associated states is
- Concurrent model development is also known as
- In Concurrent Development Model, externally observable mode of behavior is termed as
- In Concurrent Development Model, early in project when communication activity has completed its first iteration it exists in the
- In Concurrent Development Model, all activities exist concurrently but reside in
- In Concurrent Development Model, when initial communication is completed modeling makes a transition into
- In incremental process model, coding of software is done in
- When incremental model is used, first increment is often a
- Once core product is analyzed by client, there exist a
- Incremental process model focuses on delivery of an operational product with
- In incremental process model, each linear sequence of a software produces deliverable
- Errors are easy to be identified in
- Each iteration in incremental model passes through the
- A process of software development where requirements are broken down into multiple standalone modules of software development cycle
- Incremental process model phase which acknowledged that software is delivered to customer who evaluates delivered product and provides feedback based on evaluation and then iteration is processed is
- In incremental process model, each iteration phase is rigid and
- In incremental process model, requirement and specification of software are collected in
- Model which combines elements of waterfall model applied in an iterative fashion is
- In incremental process model, some high-end function are designed in
- Incremental process model phase in which modification of a software product is done after delivery to correct faults, to improve performance or other attributes is
- Each process model also prescribes a
- Prescriptive model often encompass capabilities of
- Prescriptive process model is also referred to as
- Manner in which process elements are interrelated to one another is
- We call perspective process model \'perspective\' because they prescribe a set of process
- In prototype model, iteration is planned quickly in
- Model which is useful when developer is not sure of requirements, or efficiency of an algorithm , business rules, response time, etc is
- In prototype model, iteration is planned quickly in quick plan phase and modeling of that plan occurs in
- Phase of prototype model which focuses on a representation of those aspects of software that will visible to end user is
- Prototyping model is based on
- Model which include set of general objectives for software is
- Prototype is evaluated by customer or end user in
- Developer often make implementation compromises in order to get a prototype working
- To refine requirements for software, prototype model use
- In prototype model , phase which contains objectives of prototype project and its requirements is
- Prototyping paradigm begins with
- In prototype model, quick design phase leads to construction of
- RAD stands for
- Incremental software process model that emphasizes a short development cycle is
- High speed adaptation of waterfall model in which rapid development is achieved by using a component based construction approach is
- RAD is a type of
- RAD SDLC model should be chosen only if resources with high business knowledge are available and there is a need to produce system in a
- Modeling encompasses phases which are
- Phase in which task scheduling is accomplished and is essential because multiple software teams work in parallel on different system functions is
- Model suitable for project requiring shorter development times is
- In RAD modeling, product model which is under development is designed in terms of flow of information and distribution of information between various business channels in
- If developers and customers are not committed to rapid fire activities necessary to complete system in much abbrevative time frame, RAD projects will
- Phase which establishes a basis of subsequent iterations, if required is
- Phase which emphasizes use of per-existing software components and application of automatic code generation is
- In RAD model, information gathered in business modeling phase is reviewed and analyzed to form sets of data objects vital for business in
- Phase that works to understand business problem and information characteristics that software must accommodate is
- RAD process enables a development team to create in a short time a
- In RAD modeling, data objects defined in
- Phase that establish design representations that serve as basis for RAD\'s construction activity is
- In RAD modeling, new components and all its interfaces testing are done by
- RAD should be used only when a system can be modularized to be delivered in an
- In RAD modeling, data object sets defined in data modeling phase are converted to establish business information flow needed to achieve specific business objectives as per business model in
- Business model is a candidate for RAD, if a business application can be modularized in a way that enables each major function to be completed in
- Automated tools that are used to convert process models into code and actual system are termed as
- RAD may not be appropriate when
- A relatively new software engineering paradigm that provides a process and methodological approach for defining, specifying, designing and constructing aspects is referred to as
- Model which contains a set of activities that leads to formal mathematical specifications of software is
- When concern cut across multiple system functions, features and information, they are termed as
- AOSD stands for
- COTS leads to reduction in development cycle up to
- AOCE uses a concept of horizontal slices through vertically decomposed software components called
- COTS has a productivity index of
- Component-based development model contains many characteristics of
- Development of formal models is currently quite
- Concerns related to task synchronization or memory management is
- AOP stands for
- Component-based development model leads to Software
- Components which provides targeted functionality with well-defined interfaces that enable component to be integrated into software are termed as
- Each loop in spiral model represents a
- System feasibility in spiral model is determined in
- First circuit around spiral model represents a
- Spiral model originally proposed by
- Evolutionary software process model that couples iterative nature of prototyping with controlled and systematic aspect of waterfall model is
- Model in which overall success of a project highly depends on risks analysis phase is called
- Each loop in spiral model is splited into
- Spiral model is
- Collection of use cases describe how outside actors interact with system and gain value from it is defined by
- Model which identifies design classes, subsystems and interfaces between them is
- Model describes test that are used to ensure that use case are properly reflected in software that has been constructed is
- Model that translates design classes into software components is
- Model which maps components into physical computing environment is
- Bradac found that linear nature of waterfall model leads to
- Waterfall model phase which acknowledged that software is delivered to customer who evaluates delivered product and provides feedback based on evaluation is
- Waterfall model is
- In waterfall model, phases
- Waterfall model phase which combines code generation and testing that is required to uncover errors in code is
- Waterfall model phase in which all possible requirements of system to be developed are captured and project initiate is
- Waterfall model is also known as
- Waterfall model phase which establishes a plan for software engineering work that follows i.e estimating, scheduling, tracking is
- Waterfall model phase in which modification of a software product is done after delivery to correct faults, to improve performance or other attributes is
- Oldest paradigm for software engineering is
- Model in which any phase in development process begins only if previous phase is complete is
- Waterfall model were originally proposed by
- Waterfall model phase in which system design is prepared and this system design helps in specifying system requirements and define overall system architecture is
- Which of the following are valid step in SDLC framework?
- Which of the following is the first step in SDLC framwork?
- Which of the following is not correct model in Software Development Paradigm?
- Waterfall model is not suitable for:
- In the maintenance phase the product must be tested against previous test cases. This is known as __________ testing
- Which type of integration testing uses stubs?
- Which one of the following is a functional requirement?
(c).different states
need an explanation for this answer? contact us directly to get an explanation for this answer